🌍 cheersonic Since 2014 ⭐ 12+ Year Industry Experience ✓ Verified Elite Supplier
✓ Verified Elite Supplier
Menu
Verified Elite Supplier
cheersonic
China
+8615869049660

Annual Output
1,200 units
Total Employees
100
Business Type
Smart Manufacturing

Share Us Via

UAM8000 High-Volume Ultrasonic Coating System for Fuel Cell Mass Production

Quantity:
SKU: 3325199275
Model: UAM4000/UAM6000/UAM8000

{{ variable.name }}

{{ value.name }}

UAM8000 High-Volume Ultrasonic Coating System for Fuel Cell Mass Production

Product Summary
The UAM8000 is built for industrial-scale fuel cell coating, offering high throughput and consistent quality. It leverages ultrasonic atomization to achieve uniform catalyst deposition, reducing material waste and improving production efficiency.

Key Selling Points

  • High throughput: Designed for continuous production lines.
  • Scalable: Can be integrated into multi-unit systems for 300MW capacity.
  • Consistent quality: CV ≤3% coating uniformity.
  • Reduced waste: Catalyst utilization ≥90%.
  • Automation-ready: PLC-controlled with one-click parameter recall.

Technical Specifications

ModelUAM8000
Operating Frequency25–180 kHz
Flow Rate0.001–50 mL/min
Droplet Size18–200 μm
Film Thickness20 nm–100 μm
MaterialStainless steel / titanium alloy

Models and Options

Part of the UAM series, the UAM8000 is complemented by UAM4000 and UAM6000 for varying production scales.

Materials and Structure

Robust construction using stainless steel and titanium alloy for industrial longevity.

Applications

Mass production of fuel cell MEAs, electrolyzer coating, and other clean energy applications.

Customization

Custom configurations for specific substrate widths, conveyor systems, and multi-head spraying.

Case Study

A German industrial partner deployed 10 UAM8000 units to achieve 300MW production capacity, reducing catalyst consumption by 45-55%.

FAQ

Can the UAM8000 handle double-sided coating?

Yes, it can be configured for simultaneous double-sided application.

What is the expected maintenance interval?

Scheduled maintenance every 500 hours of operation, including nozzle inspection.

Inquiry Information

MOQ: 1 unit. Terms: FOB/CIF/DDP. Payment: 30% deposit, 70% balance.

Image Filename and Alt Suggestions

UAM8000 catalytic deposition machine for high-volume production High-volume fuel cell coating system Fuel cell coating system overview